Registration number (WIID)Project No.TitleStatus
71251LVS CEN ISO/TS 23818-1:2021Assessment of conformity of plastics piping systems for the rehabilitation of existing pipelines - Part 1: Polyethylene (PE) material (ISO/TS 23818-1:2020)Standarts spēkā
70906LVS EN ISO 15877-2:2009/A2:2021Plastics piping systems for hot and cold water installations - Chlorinated poly(vinyl chloride) (PVC-C) - Part 2: Pipes - Amendment 2 (ISO 15877-2:2009/Amd 2:2020)Standarts spēkā
6215LVS EN 12118:2002Plastics piping systems - Determination of moisture content in thermoplastics by coulometryStandarts spēkā
6084LVS EN 1120:2000Plastics piping systems - Glass-reinforced thermosetting plastics (GRP) pipes and fittings - Determination of the resistance to chemical attack from the inside of a section in a deflected conditionStandarts spēkā
61353LVS CEN/TR 17179:2018Thermoplastics piping and ducting systems - Rainwater infiltration and storage attenuation systems - Practices for underground installationStandarts spēkā
6090LVS EN 1394:2016Plastics piping systems - Glass-reinforced thermosetting plastics (GRP) pipes - Determination of the apparent initial circumferential tensile strengthStandarts spēkā
70864LVS EN ISO 15876-2:2017/A1:2021Plastics piping systems for hot and cold water installations - Polybutene (PB) - Part 2: Pipes - Amendment 1 (ISO 15876-2:2017/Amd 1:2020)Standarts spēkā
64785LVS CEN ISO/TS 15875-7:2019Plastics piping systems for hot and cold water installations - Crosslinked polyethylene (PE-X) - Part 7: Guidance for the assessment of conformity (ISO/TS 15875-7:2018)Standarts spēkā
39222LVS EN ISO 6259-1:2015Thermoplastics pipes - Determination of tensile properties - Part 1: General test method (ISO 6259-1:2015)Standarts spēkā
69292LVS EN 1329-1:2021Plastics piping systems for soil and waste discharge (low and high temperature) within the building structure - Unplasticized poly(vinyl chloride) (PVC-U) - Part 1: Specifications for pipes, fittings and the systemStandarts spēkā
Displaying 1421-1430 of 1437 results.