CEN/TC 165
Registration number (WIID) | Project No. | Title | Status |
---|---|---|---|
31863 | EN 14654-2:2013 | Management and control of operational activities in drain and sewer systems outside buildings - Part 2: Rehabilitation | Atcelts |
32311 | EN 12566-3:2005+A1:2009 | Small wastewater treatment systems for up to 50 PT - Part 3: Packaged and/or site assembled domestic wastewater treatment plants | Atcelts |
32311 | LVS EN 12566-3+A1:2009 | Small wastewater treatment systems for up to 50 PT - Part 3: Packaged and/or site assembled domestic wastewater treatment plants | Atcelts |
32490 | LVS EN 12566-7:2013 | Small wastewater treatment systems for up to 50 PT - Part 7: Prefabricated tertiary treatment units | Atcelts |
32490 | EN 12566-7:2013 | Small wastewater treatment systems for up to 50 PT - Part 7: Prefabricated tertiary treatment units | Atcelts |
34564 | EN 1610:2015 | Construction and testing of drains and sewers | Izstrādē |
34564 | LVS EN 1610:2016 | Construction and testing of drains and sewers | Standarts spēkā |
35477 | LVS EN 16941-1:2018 | On-site non-potable water systems - Part 1: Systems for the use of rainwater | Atcelts |
35477 | EN 16941-1:2018 | On-site non-potable water systems - Part 1: Systems for the use of rainwater | Atcelts |
35483 | LVS EN 16323:2014 | Glossary of wastewater engineering terms | Standarts spēkā |
Displaying 361-370 of 566 results.