CEN/TC 227
| Registration number (WIID) | Project No. | Title | Status |
|---|---|---|---|
| 40557 | prEN 12697-31 rev | Bituminous mixtures - Test methods - Part 31: Specimen preparation by gyratory compactor | Izstrādē |
| 40559 | prEN 12697-32 rev | Bituminous mixtures - Test methods for hot mix asphalt - Part 32: Laboratory compaction of bituminous mixtures by vibratory compactor | Izstrādē |
| 40564 | prEN 12697-22 | Bituminous mixtures - Test methods for hot mix asphalt - Part 22: Wheel tracking | Izstrādē |
| 40565 | prEN 12697-23 rev | Bituminous mixtures - Test methods for hot mix asphalt - Part 23: Determination of the indirect tensile strength of bituminous specimens | Izstrādē |
| 10770 | - | Specifications for fly ash binders | Izstrādē |
| 40625 | EN 14227-15:2015 | Hydraulically bound mixtures - Specifications - Part 15: Hydraulically stabilized soils | Izstrādē |
| 72508 | EN 12697-41:2023 | Bituminous mixtures - Test methods - Part 41: Resistance to de-icing fluids | Izstrādē |
| 64028 | CEN/TS 12697-50:2018 | Bituminous mixtures - Test methods - Part 50: Resistance to scuffing | Izstrādē |
| 39185 | EN 13286-2:2010/AC:2012 | Unbound and hydraulically bound mixtures - Part 2: Test methods for laboratory reference density and water content - Proctor compaction | Izstrādē |
| 10779 | - | Hydraulically bound mixtures - Test methods for chemical and physical properties | Izstrādē |
Displaying 171-180 of 943 results.
