CEN/TC 227
| Registration number (WIID) | Project No. | Title | Status |
|---|---|---|---|
| 21362 | EN 13877-3:2004 | Concrete pavements - Part 3: Specifications for dowels to be used in concrete pavements | Izstrādē |
| 10764 | - | Cement bound mixtures - Specifications for soil cement and cement granular mixtures | Izstrādē |
| 21470 | EN 13286-49:2004 | Unbound and hydraulically bound mixtures - Part 49: Accelerated swelling test for soil treated by lime and/or hydraulic binder | Izstrādē |
| 72504 | EN 12697-7:2022 | Bituminous mixtures - Test methods - Part 7: Determination of the bulk density of bituminous specimens by gamma rays | Izstrādē |
| 10758 | - | Joint fillers and sealants - Test methods for backing materials to be used prior to joint sealants | Izstrādē |
| 36272 | EN 13877-2:2013 | Concrete pavements - Part 2: Functional requirements for concrete pavements | Izstrādē |
| 62959 | prEN 17392-1 | Sustainability of construction works - Environmental product declarations - Core rules for road materials - Part 1: Bituminous mixtures | Izstrādē |
| 21466 | EN 13286-51:2004 | Unbound and hydraulically bound mixtures - Part 51: Method for the manufacture of test specimens of hydraulically bound mixtures using vibrating hammer compaction | Izstrādē |
| 39014 | EN 13108-20:2016 | Bituminous mixtures - Material specifications - Part 20: Type Testing | Izstrādē |
| 39013 | EN 13108-21:2016 | Bituminous mixtures - Material specifications - Part 21: Factory Production Control | Izstrādē |
Displaying 261-270 of 943 results.
