CEN/TC 227
| Registration number (WIID) | Project No. | Title | Status |
|---|---|---|---|
| 21466 | EN 13286-51:2004 | Unbound and hydraulically bound mixtures - Part 51: Method for the manufacture of test specimens of hydraulically bound mixtures using vibrating hammer compaction | Izstrādē |
| 32237 | EN 12697-24:2004+A1:2007/prAC | Bituminous mixtures - Test methods for hot mix asphalt - Part 24: Resistance to fatigue | Izstrādē |
| 10877 | EN 12697-38:2004 | Bituminous mixtures - Test methods for hot mix asphalt - Part 38: Common equipment and calibration | Izstrādē |
| 40565 | prEN 12697-23 rev | Bituminous mixtures - Test methods for hot mix asphalt - Part 23: Determination of the indirect tensile strength of bituminous specimens | Izstrādē |
| 32234 | EN 12697-17:2004+A1:2007/prAC | Bituminous mixtures - Test methods for hot mix asphalt - Part 17: Particle loss of porous asphalt specimen | Izstrādē |
| 40564 | prEN 12697-22 | Bituminous mixtures - Test methods for hot mix asphalt - Part 22: Wheel tracking | Izstrādē |
| 65346 | EN 12697-2:2015/prA1 | Bituminous mixtures - Test methods - Part 2: Determination of particle size distribution | Izstrādē |
| 40559 | prEN 12697-32 rev | Bituminous mixtures - Test methods for hot mix asphalt - Part 32: Laboratory compaction of bituminous mixtures by vibratory compactor | Izstrādē |
| 10848 | EN 13863-2:2003 | Concrete pavements - Part 2: Test method for the determination of the bond between two layers | Izstrādē |
| 62959 | prEN 17392-1 | Sustainability of construction works - Environmental product declarations - Core rules for road materials - Part 1: Bituminous mixtures | Izstrādē |
Displaying 851-860 of 948 results.
