CEN/TC 234
Registration number (WIID) | Project No. | Title | Status |
---|---|---|---|
11316 | CR 13737:2000 | Implementation Guide for functional standards prepared by CEN/TC 234 "Gas supply" | Atcelts |
24827 | EN 12186:2000/A1:2005 | Gas supply systems - Gas pressure regulating stations for transmission and distribution - Functional requirements | Atcelts |
29589 | EN 1594:2009 | Gas supply systems - Pipelines for maximum operating pressure over 16 bar - Functional requirements | Atcelts |
24592 | CEN/TS 15399:2007 | Gas Supply Systems - Guidelines for Management systems for Gas Distribution Network | Atcelts |
29608 | EN 15001-2:2008 | Gas supply systems - Gas installation pipework with an operating pressure greater than 0.5 bar for industrial installations and greater than 5 bar for industrial and non-industrial installations - Part 2: Detailed functional requirements for commissioning, operation and maintenance | Atcelts |
29607 | EN 15001-1:2009 | Gas Infrastructure - Gas installation pipework with an operating pressure greater than 0,5 bar for industrial installations and greater than 5 bar for industrial and non-industrial installations - Part 1: Detailed functional requirements for design, materials, construction, inspection and testing | Atcelts |
31798 | EN 12007-5:2014 | Gas infrastructure - Pipelines for maximum operating pressure up to and including 16 bar - Part 5: Service lines - Specific functional requirements | Atcelts |
31802 | EN 12583:2014 | Gas Infrastructure - Compressor stations - Functional requirements | Atcelts |
38695 | EN 16726:2015 | Gas infrastructure - Quality of gas - Group H | Atcelts |
29606 | EN 12732:2013 | Gas infrastructure - Welding steel pipework - Functional requirements | Atcelts |
Displaying 111-120 of 185 results.