CEN/TC 234
Registration number (WIID) | Project No. | Title | Status |
---|---|---|---|
61964 | LVS EN 15001-2:2023 | Gas supply systems - Gas installation pipework with an operating pressure greater than 0,5 bar for industrial installations and greater than 5 bar for industrial and non-industrial installations - Part 2: Detailed functional requirements for commissioning, operation and maintenance | Standarts spēkā |
71961 | EN 17649:2022 | Gas infrastructure - Safety Management System (SMS) and Pipeline Integrity Management System (PIMS) - Functional requirements | Standarts spēkā |
73772 | LVS EN 1594:2024 | Gas infrastructure - Pipelines for maximum operating pressure over 16 bar - Functional requirements | Standarts spēkā |
29605 | LVS EN 12327:2012 | Gas infrastructure - Pressure testing, commissioning and decommissioning procedures - Functional requirements | Standarts spēkā |
70769 | LVS EN 17928-3:2025 | Gas infrastructure - Injection stations - Part 3: Specific requirements regarding the injection of hydrogen | Standarts spēkā |
73772 | EN 1594:2024 | Gas infrastructure - Pipelines for maximum operating pressure over 16 bar - Functional requirements | Standarts spēkā |
35635 | LVS CEN/TR 13737-1:2012 | Implementation Guide for functional standards prepared by CEN/TC 234 Gas infrastructure - Part 1: General | Standarts spēkā |
29602 | LVS EN 12007-2:2012 | Gas infrastructure - Pipelines for maximum operating pressure up to and including 16 bar - Part 2: Specific functional requirements for polyethylene (MOP up to and including 10 bar) | Standarts spēkā |
69954 | LVS EN 17928-1:2025 | Gas infrastructure - Injection stations - Part 1: General requirements | Standarts spēkā |
70762 | LVS EN 17928-2:2025 | Gas infrastructure - Injection stations - Part 2: Specific requirements regarding the injection of biomethane | Standarts spēkā |
Displaying 171-180 of 185 results.