CEN/TC 234
| Registration number (WIID) | Project No. | Title | Status |
|---|---|---|---|
| 35635 | CEN/TR 13737-1:2012 | Implementation Guide for functional standards prepared by CEN/TC 234 Gas infrastructure - Part 1: General | Izstrādē |
| 80560 | - | Gas infrastructure — Equipment to be installed and procedures to be used to prevent or minimise venting and flaring with limitations and feasibility criteria | Izstrādē |
| 78835 | - | Gas infrastructure - Conversion of pipelines with maximum operating pressure over 16 bar for the use of hydrogen - Functional requirements | Izstrādē |
| 79787 | - | Gas infrastructure - Methan leak detection and repair programmes for gas transmission, distribution and storage systems and LNG terminals - Functional requirements | Izstrādē |
| 70766 | - | Gas infrastructure - Plants for the injection of renewable gases into natural gas networks - Part 4: Plants for the preparation of combustible gas mixtures | Izstrādē |
| 11294 | - | Specific functional requirements for gas installations in high rise buildings | Izstrādē |
| 11295 | - | Specific functional requirements for gas installations in public access buildings | Izstrādē |
| 83105 | - | Gas infrastructure - Quality of gas - Aspects of rate of change of gas quality parameter on gas infrastructure and end-use | Izstrādē |
| 83104 | - | Gas infrastructure - Quality of gas - Aspects of oxygen in the gas infrastructure and end-use | Izstrādē |
| 11296 | - | Specific functional requirements for gas installations in commercial buildings | Izstrādē |
Displaying 181-190 of 197 results.
