CEN/TC 234
| Registration number (WIID) | Project No. | Title | Status |
|---|---|---|---|
| 67932 | CEN/TS 12007-6:2021 | Gas infrastructure - Pipelines for maximum operating pressure up to and including 16 bar - Part 6: Specific functional recommendations for unplasticized polyamide (PA-U) | Izstrādē |
| 41846 | CEN/TR 16787:2014 | Industrial Gas Installation - Guideline | Izstrādē |
| 80558 | prEN 12327 rev | Gas infrastructure - Pressure testing, commissioning and decommissioning procedures - Functional requirements | Izstrādē |
| 72450 | FpCEN/TS 17874:2022 | Methodology for methane emissions quantification for gas transmission, distribution and storage systems and LNG terminals | Izstrādē |
| 29605 | EN 12327:2012 | Gas infrastructure - Pressure testing, commissioning and decommissioning procedures - Functional requirements | Izstrādē |
| 77241 | prEN 1918-2 | Gas infrastructure - Underground gas storage - Part 2: Functional recommendations for storage in oil and gas fields | Izstrādē |
| 40175 | - | Gas infrastructure - Gas specific asset management requirements | Izstrādē |
| 37832 | CEN/TR 16388:2012 | Gas-Specific Environmental Document - Guideline for incorporating within standards to minimize the environmental impact of gas infrastructure across the whole life cycle | Izstrādē |
| 78835 | - | Gas infrastructure - Conversion of pipelines with maximum operating pressure over 16 bar for the use of hydrogen - Functional requirements | Izstrādē |
| 24093 | prEN 15001-1 | Gas Supply Systems - Gas installation pipework with an operating pressure greater than 0,5 bar for industrial, commercial and non-domestic gas installations - Part 1: Detailed functional requirements for design, materials, construction, inspection and testing | Izstrādē |
Displaying 181-190 of 195 results.
