Registration number (WIID)Project No.TitleStatus
80558prEN 12327 revGas infrastructure - Pressure testing, commissioning and decommissioning procedures - Functional requirementsIzstrādē
80559-Gas infrastructure — Methodology for methane emissions quantification for gas transmission, and distribution systems, underground gas storage and LNG terminalsIzstrādē
80560-Gas infrastructure — Equipment to be installed and procedures to be used to prevent or minimise venting and flaring with limitations and feasibility criteriaIzstrādē
80562prCEN/TS 12007-6 revGas infrastructure - Pipelines for maximum operating pressure up to and including 16 bar - Part 6: Specific functional recommendations for unplasticized polyamide (PA-U)Izstrādē
81578EN 15001-1:2023/prA1Gas Infrastructure - Gas installation pipework with an operating pressure greater than 0,5 bar for industrial installations and greater than 5 bar for industrial and non-industrial installations - Part 1: Detailed functional requirements for design, materials, construction, inspection and testingIzstrādē
Displaying 181-185 of 185 results.