CEN/TC 234
| Registration number (WIID) | Project No. | Title | Status |
|---|---|---|---|
| 29604 | EN 12007-4:2012 | Gas infrastructure - Pipelines for maximum operating pressure up to and including 16 bar - Part 4: Specific functional recommendations for renovation | Izstrādē |
| 84132 | EN 17649:2022+A1:2026 | Gas infrastructure - Safety Management System (SMS), Pipeline Integrity Management System (PIMS) and Compressor station integrity management system (CIMS) - Functional requirements | Izstrādē |
| 83255 | prEN 12007-4 rev | Gas infrastructure - Pipelines for maximum operating pressure up to and including 16 bar - Part 4: Specific functional requirements for renovation | Izstrādē |
| 80562 | prCEN/TS 12007-6 rev | Gas infrastructure - Pipelines for maximum operating pressure up to and including 16 bar - Part 6: Specific functional recommendations for unplasticized polyamide (PA-U) | Izstrādē |
| 78653 | EN 12583:2022/prA1 | Gas Infrastructure - Compressor stations - Functional requirements | Izstrādē |
| 83256 | prEN 12007-3 rev | Gas infrastructure - Pipelines for maximum operating pressure up to and including 16 bar - Part 3: Specific functional requirements for steel | Izstrādē |
| 83259 | prEN 12007-2 rev | Gas infrastructure - Pipelines for maximum operating pressure up to and including 16 bar - Part 2: Specific functional requirements for polyethylene (MOP up to and including 10 bar) | Izstrādē |
| 29601 | EN 12007-1:2012 | Gas infrastructure - Pipelines for maximum operating pressure up to and including 16 bar - Part 1: General functional recommendations | Izstrādē |
| 70766 | - | Gas infrastructure - Plants for the injection of renewable gases into natural gas networks - Part 4: Plants for the preparation of combustible gas mixtures | Izstrādē |
| 37086 | EN 1918-3:2016 | Gas infrastructure - Underground gas storage - Part 3: Functional requirements for storage in solution-mined salt caverns | Izstrādē |
Displaying 21-30 of 197 results.
