Registration number (WIID)Project No.TitleStatus
21524LVS CR 13737:2003Implementation guide for functional standards prepared by CEN/TC 234 "Gas supply"Atcelts
37083EN 1594:2013Gas infrastructure - Pipelines for maximum operating pressure over 16 bar - Functional requirementsAtcelts
24236LVS CEN/TS 15174:2006Gas supply systems - Guideline for safety management systems for natural gas transmission pipelinesAtcelts
29607LVS EN 15001-1:2009 AGas Infrastructure - Gas installation pipework with an operating pressure greater than 0,5 bar for industrial installations and greater than 5 bar for industrial and non-industrial installations - Part 1: Detailed functional requirements for design, materials, construction, inspection and testingAtcelts
29608LVS EN 15001-2:2009 AGas infrastructure - Gas installation pipework with an operating pressure greater than 0, 5 bar for industrial installations and greater than 5 bar for industrial and non-industrial installations - Part 2: Detailed functional requirements for commissioning, operation and maintenanceAtcelts
11300EN 1594:2000Gas supply systems - Pipelines for maximum operating pressure over 16 bar - Functional requirementsAtcelts
67274EN 16726:2015+A1:2018Gas infrastructure - Quality of gas - Group HAtcelts
29606EN 12732:2013Gas infrastructure - Welding steel pipework - Functional requirementsAtcelts
11297LVS EN 12007-1:2000Gas supply systems - Pipelines for maximum operating pressure up to and including 16 bar - Part 1: General functional recommendationsAtcelts
29608EN 15001-2:2008Gas supply systems - Gas installation pipework with an operating pressure greater than 0.5 bar for industrial installations and greater than 5 bar for industrial and non-industrial installations - Part 2: Detailed functional requirements for commissioning, operation and maintenanceAtcelts
Displaying 71-80 of 186 results.