CEN/TC 256
| Registration number (WIID) | Project No. | Title | Status |
|---|---|---|---|
| 12958 | EN 13848-2:2006 | Railway applications - Track - Track geometry quality - Part 2: Measuring systems - Track recording vehicles | Atcelts |
| 12965 | prEN 15220-1 | Railway applications - Brake indicators - Part 1: Pneumatically operated brake indicators | Atcelts |
| 12893 | EN 13230-3:2002 | Railway applications - Track - Concrete sleepers and bearers - Part 3: Twin-block reinforced sleepers | Atcelts |
| 12903 | EN 13231-2:2006 | Railway applications - Track - Acceptance of works - Part 2: Works on ballasted track - Switches and crossings | Atcelts |
| 21200 | LVS EN 15085-5:2008 | Railway applications - Welding of railway vehicles and components - Part 5: Inspection, testing and documentation | Atcelts |
| 34562 | LVS EN 16186-3:2016 | Railway applications - Driver's cab - Part 3: Design of displays | Atcelts |
| 12897 | LVS EN 13146-4:2003 | Railway applications - Track - Test methods for fastening systems - Part 4: Effect of repeated loading | Atcelts |
| 12894 | EN 13146-1:2002 | Railway applications - Track - Test methods for fastening systems - Part 1: Determination of longitudinal rail restraint | Atcelts |
| 12896 | EN 13146-3:2002 | Railway applications - Track - Test methods for fastening systems - Part 3: Determination of attenuation of impact loads | Atcelts |
| 12897 | EN 13146-4:2002 | Railway applications - Track - Test methods for fastening systems - Part 4: Effect of repeated loading | Atcelts |
Displaying 741-750 of 1928 results.
