CEN/TC 269
| Registration number (WIID) | Project No. | Title | Status |
|---|---|---|---|
| 31233 | prEN 12953-7 rev | Shell boilers - Part 7 : Requirements for firing systems for liquid and gaseous fuels for the boilers | Izstrādē |
| 13687 | EN 12952-15:2003 | Water-tube boilers and auxiliary installations - Part 15: Acceptance tests | Izstrādē |
| 13691 | EN 12952-16:2002 | Water-tube boilers and auxiliary installations - Part 16: Requirements for grate and fluidized-bed firing systems for solid fuels for the boiler | Atcelts |
| 13690 | EN 12952-9:2002 | Water-tube boilers and auxiliary installations - Part 9: Requirements for firing systems for pulverized solid fuels for the boiler | Atcelts |
| 13677 | EN 12952-5:2001 | Water-tube boilers and auxiliary installations - Part 5: Workmanship and construction of pressure parts of the boiler | Atcelts |
| 13678 | EN 12952-7:2002 | Water-tube boilers and auxiliary installations - Part 7: Requirements for equipment for the boiler | Atcelts |
| 13679 | EN 12952-8:2002 | Water-tube boilers and auxiliary installations - Part 8: Requirements for firing systems for liquid and gaseous fuels for the boiler | Atcelts |
| 13668 | EN 12953-6:2002 | Shell boilers - Part 6: Requirements for equipment for the boiler | Atcelts |
| 21218 | LVS EN 12953-5:2003 | Shell boilers - Part 5: Inspection during construction, documentation and marking of pressure parts of the boiler | Atcelts |
| 13676 | EN 12952-4:2000 | Water-tube boilers and auxiliary installations - Part 4: In-service boiler life expectancy calculations | Atcelts |
Displaying 51-60 of 165 results.
