ISO/TC 21/SC 5
| Registration number (WIID) | Project No. | Title | Status |
|---|---|---|---|
| 68538 | ISO/CD 6182-3 | Fire protection — Automatic sprinkler systems — Part 3: Requirements and test methods for dry pipe valves | Izstrādē |
| 63413 | ISO 6182-12:2010/NP Amd 1 | Fire protection — Automatic sprinkler systems — Part 12: Requirements and test methods for grooved-end components for steel pipe systems — Amendment 1 | Izstrādē |
| 42120 | ISO/WD 6182-4 | Fire protection — Automatic sprinkler systems — Part 4: Requirements and test methods for quick-opening devices | Izstrādē |
| 46498 | ISO/NP 6182-4 | Fire protection — Automatic sprinkler systems — Part 4: Requirements and test methods for quick-opening devices | Izstrādē |
| 31664 | ISO/CD 6182-12 | Fire protection — Automatic sprinkler systems — Part 12: Requirements and test methods for grooved end pipe couplings | Izstrādē |
| 31665 | ISO/CD 6182-13 | Fire protection — Automatic sprinkler systems — Part 13: Requirements and test methods for extended coverage sprinklers | Izstrādē |
| 24583 | ISO/DIS 6182-6 | Fire protection — Automatic sprinkler systems — Part 6: Requirements and test methods for check valves | Izstrādē |
| 13647 | ISO/CD 7075-2 | Fire protection equipment — Automatic fire extinguishing systems using halogenated hydrocarbons — Part 2: Halon 1211 total flooding systems | Izstrādē |
| 15683 | ISO/CD 8476-1 | Fire protection equipment — Automatic carbon dioxide fire extinguishing systems — Components specifications — Part 1: Container valves | Izstrādē |
| 71057 | ISO/CD 6182-18 | Fire protection — Automatic sprinkler systems — Part 18: Requirements and test methods for flexible sprinkler hose | Izstrādē |
Displaying 41-50 of 65 results.
