ISO/TC 92/SC 4
| Registration number (WIID) | Project No. | Title | Status |
|---|---|---|---|
| 73756 | ISO/PWI 20710-6 | Fire safety engineering — Active fire protection systems — Part 6: Operation and effectiveness of smoke control systems | Izstrādē |
| 45357 | ISO/PWI 29242 | Fire Safety Engineering — Examples of fire risk assessment — Fire in a warehouse with a single commodity and fire in a multipurpose covered stadium | Izstrādē |
| 85159 | ISO/PWI 20710-6 | "Fire safety engineering – Active fire protection systems — Part 4: Operation and effectiveness of the fire suppression systems | Izstrādē |
| 67935 | ISO/CD 20414 | Fire safety engineering — Verification and validation protocol for building fire evacuation models | Izstrādē |
| 73755 | ISO/PWI 20710-5 | Fire safety engineering — Active fire protection systems — Part 5: Estimation of firefighting | Izstrādē |
| 45356 | ISO/PWI 29241 | Fire Safety Engineering — Examples of selection of design fires | Izstrādē |
| 68898 | ISO/PWI 20710-2 | Fire safety engineering — Active fire protection systems — Part 2: Estimation of detection time | Izstrādē |
| 63934 | ISO/PWI TR 19089 | Fire safety engineering — Global fire safety engineering analysis and information system | Izstrādē |
| 85156 | ISO/DTR 24679-4 | Fire safety engineering — Performance of structures in fire — Part 4: Example of a fifteen storey steel-framed office building | Izstrādē |
| 45660 | ISO/PWI 29762 | Fire Safety Engineering — Example of the use of fire probabilistic risk assessment | Izstrādē |
Displaying 81-90 of 126 results.
