Registration number (WIID)Project No.TitleStatus
10489LVS 408:2002Designing of oil and oil product pipelinesAtcelts
10522LVS 364:2003Operation, maintenance and repair of natural gas storage and transmission pipelines systemAtcelts
10718LVS 350:2002 /A2:2004 /AC:2005Tanks - Technical examination of existing tanksAtcelts
10813LVS 422:2002Design of natural gas transmission (main) pipelinesAtcelts
10822LVS 350:2002Tanks - Technical examination of existing tanksAtcelts
10863LVS 350:2014Tanks. Technical examination of existing tanksAtcelts
10898LVS 422:2002 /A1:2003Design of natural gas transmission (main) pipelinesAtcelts
10970LVS 373:2006 /AC:2006Vertical steel single insulatedtanks V = 40000-45000 m3 for storage of liquefied ammoniaAtcelts
10936LVS 350:2002 /A1:2003Tanks - Technical examination of existing tanksAtcelts
10946LVS 350:2002 /A2:2004Tanks - Technical examination of existing tanksAtcelts
Displaying 31-40 of 58 results.