CEN/TC 191/SC 1/WG 6
| Committee | CEN/TC 191/SC 1/WG 6 |
|---|---|
| Title LV | Not set |
| Title EN | Design and calculation methods and installation procedures for pressure differential smoke control systems |
| Scope LV | Not set |
| Scope EN | The design, construction and maintenance of pressure differential systems for installation in buildings or other construction works. |
| Creation date | 01.01.1997 |
| Status | Active |
| TC officer | Aiva Kukule |
| Not set | |
| Phone | Not set |
