Registration number (WIID)Project No.TitleStatus
35848-Earthworks - Part 7: Hydraulic placement of extractive wasteIzstrādē
75529-Earthworks - Part 9: Sustainable earthworks (CEN/TR 16907-9)Izstrādē
64531-Earthworks - Use of secondary manufactured and recycled materials in EarthworksIzstrādē
59907-Earthworks - Test proceduresIzstrādē
80064-prCEN/TS 17685-3 "Earthworks — Chemical tests — Part 3: Determination of carbonate content in soils"Izstrādē
75543-Earthworks – Soil treatment tests – Part 3: Non-destructive seismic test method for mechanical performanceIzstrādē
75528CEN/TR 16907-8:2024Earthworks - Part 8: Alternative materials in earthworksStandarts spēkā
39819CEN/TS 17006:2016Earthworks - Continuous Compaction Control (CCC)Izstrādē
73417CEN/TS 17685-2:2024Earthworks - Chemical tests - Part 2: Determination of organic matter content by potassium permanganate methodStandarts spēkā
70926CEN/TS 17693-1:2021Earthworks - Soil treatment tests - Part 1: pH-test for determination of the lime requirement of soils for stabilization (Lime Fixation Point LFP, Lime Modification Optimum LMO)Izstrādē
Displaying 1-10 of 46 results.