Registration number (WIID)Project No.TitleStatus
7258-Sewage treatment plants - Large treatment plants (> 500 inhabitants) - Part 10: Preliminary treatmentIzstrādē
78838-Renovation and repair of drains and sewers – Structural design – Resistance of circular plastics close-fitting liners to external hydrostatic pressureIzstrādē
71515-Mortar for the construction and rehabilitation of drains and sewers outside buildings - Part 2: Requirements for cement-based materialsIzstrādē
64290-Mortar for the construction and rehabilitation of drains and sewers outside buildingsIzstrādē
78741-Mortar for the construction and rehabilitation of drains and sewers outside buildings - Part 2: Requirements for cement-based materialsIzstrādē
24506CEN/TC 165 N 1476Vitrified clay pipes and fittings and pipe joints for drains for drains and sewers - Part 7: Requirements for vitrified clay jacking pipes and fittingsIzstrādē
24505CEN/TC 165 N 1476Vitrified clay pipes and fittings and pipe joints for drains for drains and sewers - Part 6: Requirements for vitrified clay manholesIzstrādē
24504CEN/TC 165 N 1476Vitrified clay pipes and fittings and pipe joints for drains for drains and sewers - Part 5: Requirements for perforated vitrified clay pipes and fittingsIzstrādē
20923CEN/TC 165 N 1497Small wastewater treatment systems for up to 50 PT - Part 6: Packaged and/or site assembled secondary treatments unitsIzstrādē
7283CEN/TR 12566-2:2005Small wastewater treatment systems for up to 50 PT - Part 2: Soil infiltration systemsIzstrādē
Displaying 31-40 of 578 results.