CEN/TC 234
Registration number (WIID) | Project No. | Title | Status |
---|---|---|---|
31798 | EN 12007-5:2014 | Gas infrastructure - Pipelines for maximum operating pressure up to and including 16 bar - Part 5: Service lines - Specific functional requirements | Atcelts |
31802 | EN 12583:2014 | Gas Infrastructure - Compressor stations - Functional requirements | Atcelts |
11314 | EN 12007-2:2000 | Gas supply systems - Gas pipelines for maximum operating pressure up to and including 16 bar - Part 2: Specific functional recommendations for polyethylene (MOP up to and including 10 bar) | Atcelts |
29607 | EN 15001-1:2009 | Gas Infrastructure - Gas installation pipework with an operating pressure greater than 0,5 bar for industrial installations and greater than 5 bar for industrial and non-industrial installations - Part 1: Detailed functional requirements for design, materials, construction, inspection and testing | Atcelts |
11304 | EN 1918-4:1998 | Gas supply systems - Underground gas storage - Part 4: Functional recommendations for storage in rock caverns | Atcelts |
41364 | LVS EN 12732+A1:2014 | Gas infrastructure - Welding steel pipework - Functional requirements | Atcelts |
21524 | CR 13737:2001 | Implementation Guide for functional standards prepared by CEN/TC 234 "Gas supply" | Atcelts |
11312 | EN 12007-4:2000 | Gas supply systems - Pipelines for maximum operating pressure up to and including 16 bar - Part 4: Specific functional recommendations for renovation | Atcelts |
29608 | EN 15001-2:2008 | Gas supply systems - Gas installation pipework with an operating pressure greater than 0.5 bar for industrial installations and greater than 5 bar for industrial and non-industrial installations - Part 2: Detailed functional requirements for commissioning, operation and maintenance | Atcelts |
29606 | EN 12732:2013 | Gas infrastructure - Welding steel pipework - Functional requirements | Atcelts |
Displaying 71-80 of 185 results.