ISO/TC 67/SC 4
| Registration number (WIID) | Project No. | Title | Status |
|---|---|---|---|
| 92013 | ISO/NP 25918 | Oil and gas industries including lower carbon energy — Drilling and production equipment — Plunger lift downhole equipment | Izstrādē |
| 92061 | ISO/NP 25923-1 | Oil and gas industries including low carbon energy -Managed Pressure Drilling — Part 1: Equipment general requirements | Izstrādē |
| 93413 | ISO/NP 26401 | Oil and gas industries including lower carbon energy — Drilling, production and injection equipment — Tower-type pumping unit | Izstrādē |
Displaying 171-173 of 173 results.
