Informējam, ka Sistēma pielāgota darbam ar interneta pārlūkprogrammu Internet Explorer (8. un jaunākām versijām) un Mozilla Firefox (3.6 un jaunākām versijām).
Izmantojot citu interneta pārlūkprogrammu, brīdinām, ka Sistēmas funkcionalitāte var tikt traucēta.
This part of IEC 60079 gives the specific requirements for the construction, testing and marking of electrical Ex Equipment, parts of electrical Ex Equipment and Ex Components with the Type of Protection encapsulation "m" (hereinafter referred to as "m" Equipment) intended for use in explosive gas atmospheres or explosive dust atmospheres.
For Levels of Protection "mb" and "mc", this document applies where the rated voltage does not exceed 11 kV ACRMS or DC.
For Level of Protection "ma", this document applies where the rated voltage does not exceed 1 kV ACRMS or DC.
This document does not take account of any hazard due to an emission of flammable or toxic gas from the dust.
This document supplements and modifies the general requirements of IEC 60079-0. Where a requirement of this document conflicts with a requirement of IEC 60079-0, the requirement of this document takes precedence.
Reģistrācijas numurs (WIID)
83180
Darbības sfēra
This part of IEC 60079 gives the specific requirements for the construction, testing and marking of electrical Ex Equipment, parts of electrical Ex Equipment and Ex Components with the Type of Protection encapsulation "m" (hereinafter referred to as "m" Equipment) intended for use in explosive gas atmospheres or explosive dust atmospheres.
For Levels of Protection "mb" and "mc", this document applies where the rated voltage does not exceed 11 kV ACRMS or DC.
For Level of Protection "ma", this document applies where the rated voltage does not exceed 1 kV ACRMS or DC.
This document does not take account of any hazard due to an emission of flammable or toxic gas from the dust.
This document supplements and modifies the general requirements of IEC 60079-0. Where a requirement of this document conflicts with a requirement of IEC 60079-0, the requirement of this document takes precedence.