The electrical safety tests described in this standard shall be carried out at the final stage of manufacture on the following Automatic Electrical Controls:
a) free standing and in line cord controls, 100% of production.
b) independently mounted Automatic Electrical Controls, 100% of production.
c) any Automatic Electrical Controls with flexible integrated or internal conductors, 100% of production
d) incorporated or integrated Automatic Electrical Controls with any surfaces directly accessible to the end user when mounted as declared 100% of production. Except that for controls where 100% testing is carried out on the final equipment in which the control is incorporated or integrated, routine testing is not required and testing is subject to agreement between the Control Manufacturer and the Appliance Manufacturer.
Reģistrācijas numurs (WIID)
49285
Darbības sfēra
The electrical safety tests described in this standard shall be carried out at the final stage of manufacture on the following Automatic Electrical Controls:
a) free standing and in line cord controls, 100% of production.
b) independently mounted Automatic Electrical Controls, 100% of production.
c) any Automatic Electrical Controls with flexible integrated or internal conductors, 100% of production
d) incorporated or integrated Automatic Electrical Controls with any surfaces directly accessible to the end user when mounted as declared 100% of production. Except that for controls where 100% testing is carried out on the final equipment in which the control is incorporated or integrated, routine testing is not required and testing is subject to agreement between the Control Manufacturer and the Appliance Manufacturer.