Informējam, ka Sistēma pielāgota darbam ar interneta pārlūkprogrammu Internet Explorer (8. un jaunākām versijām) un Mozilla Firefox (3.6 un jaunākām versijām).
Izmantojot citu interneta pārlūkprogrammu, brīdinām, ka Sistēmas funkcionalitāte var tikt traucēta.
TC21X working group 3 has been agree to implement following changes to EN 50342-1:2015/1:2018
- Deletion of high current discharge after water consumption test. This is not needed as a dedicated corrosion test is available in the document.
- Limitation of the maximum discharge time in cranking performance test. Batteries with high power capability might be damaged if discharge until the cut off voltage of 6,0 V is reached. To prevent this the maximum discharge time of the second step of the cranking performance test has been limited to 180 s.
Reģistrācijas numurs (WIID)
72745
Darbības sfēra
TC21X working group 3 has been agree to implement following changes to EN 50342-1:2015/1:2018
- Deletion of high current discharge after water consumption test. This is not needed as a dedicated corrosion test is available in the document.
- Limitation of the maximum discharge time in cranking performance test. Batteries with high power capability might be damaged if discharge until the cut off voltage of 6,0 V is reached. To prevent this the maximum discharge time of the second step of the cranking performance test has been limited to 180 s.