Projekta Nr.ISO 10903:2025
Nosaukums<p class="MsoBodyText"><span lang="EN-GB">This document provides requirements and guidance on planning, selecting, and implementing methods and strategies for monitoring geohazards that can interact with pipelines.</span></p> <p class="MsoBodyText"><span lang="EN-GB">This document specifies requirements and recommendations for users regarding the development and initiation of monitoring processes throughout the pipeline life cycle, including the following stages: </span></p> <p class="ListNumber1" style="mso-list: l0 level1 lfo1;"><!-- [if !supportLists]--><span lang="EN-GB" style="mso-fareast-font-family: Cambria; mso-bidi-font-family: Cambria;"><span style="mso-list: Ignore;">a)<span style="font: 7.0pt 'Times New Roman';">       </span></span></span><!--[endif]--><span lang="EN-GB">preliminary engineering and route selection phase;</span></p> <p class="ListNumber1" style="mso-list: l0 level1 lfo1;"><!-- [if !supportLists]--><span lang="EN-GB" style="mso-fareast-font-family: Cambria; mso-bidi-font-family: Cambria;"><span style="mso-list: Ignore;">b)<span style="font: 7.0pt 'Times New Roman';">       </span></span></span><!--[endif]--><span lang="EN-GB">detailed design phase;</span></p> <p class="ListNumber1" style="mso-list: l0 level1 lfo1;"><!-- [if !supportLists]--><span lang="EN-GB" style="mso-fareast-font-family: Cambria; mso-bidi-font-family: Cambria;"><span style="mso-list: Ignore;">c)<span style="font: 7.0pt 'Times New Roman';">        </span></span></span><!--[endif]--><span lang="EN-GB">construction phase;</span></p> <p class="ListNumber1" style="mso-list: l0 level1 lfo1;"><!-- [if !supportLists]--><span lang="EN-GB" style="mso-fareast-font-family: Cambria; mso-bidi-font-family: Cambria;"><span style="mso-list: Ignore;">d)<span style="font: 7.0pt 'Times New Roman';">       </span></span></span><!--[endif]--><span lang="EN-GB">operation and maintenance phase.</span></p> <p class="MsoBodyText"><span lang="EN-GB">This document also describes the processes and steps for developing a suitable geohazard monitoring program (GHMP).</span></p> <p class="MsoBodyText"><span lang="EN-GB">This document applies to geohazard monitoring of new and existing onshore gathering and transportation pipelines and the right-of-way (RoW).</span></p> <p class="MsoBodyText"><span lang="EN-GB">This document does not apply to monitoring geohazards that are temporary, such as the stability of spoil piles, temporary cut slopes to facilitate pipeline construction, stability of excavation or trench wall, and access roads.</span></p>
Reģistrācijas numurs (WIID)83758
Darbības sfēra<p class="MsoBodyText"><span lang="EN-GB">This document provides requirements and guidance on planning, selecting, and implementing methods and strategies for monitoring geohazards that can interact with pipelines.</span></p> <p class="MsoBodyText"><span lang="EN-GB">This document specifies requirements and recommendations for users regarding the development and initiation of monitoring processes throughout the pipeline life cycle, including the following stages: </span></p> <p class="ListNumber1" style="mso-list: l0 level1 lfo1;"><!-- [if !supportLists]--><span lang="EN-GB" style="mso-fareast-font-family: Cambria; mso-bidi-font-family: Cambria;"><span style="mso-list: Ignore;">a)<span style="font: 7.0pt 'Times New Roman';">       </span></span></span><!--[endif]--><span lang="EN-GB">preliminary engineering and route selection phase;</span></p> <p class="ListNumber1" style="mso-list: l0 level1 lfo1;"><!-- [if !supportLists]--><span lang="EN-GB" style="mso-fareast-font-family: Cambria; mso-bidi-font-family: Cambria;"><span style="mso-list: Ignore;">b)<span style="font: 7.0pt 'Times New Roman';">       </span></span></span><!--[endif]--><span lang="EN-GB">detailed design phase;</span></p> <p class="ListNumber1" style="mso-list: l0 level1 lfo1;"><!-- [if !supportLists]--><span lang="EN-GB" style="mso-fareast-font-family: Cambria; mso-bidi-font-family: Cambria;"><span style="mso-list: Ignore;">c)<span style="font: 7.0pt 'Times New Roman';">        </span></span></span><!--[endif]--><span lang="EN-GB">construction phase;</span></p> <p class="ListNumber1" style="mso-list: l0 level1 lfo1;"><!-- [if !supportLists]--><span lang="EN-GB" style="mso-fareast-font-family: Cambria; mso-bidi-font-family: Cambria;"><span style="mso-list: Ignore;">d)<span style="font: 7.0pt 'Times New Roman';">       </span></span></span><!--[endif]--><span lang="EN-GB">operation and maintenance phase.</span></p> <p class="MsoBodyText"><span lang="EN-GB">This document also describes the processes and steps for developing a suitable geohazard monitoring program (GHMP).</span></p> <p class="MsoBodyText"><span lang="EN-GB">This document applies to geohazard monitoring of new and existing onshore gathering and transportation pipelines and the right-of-way (RoW).</span></p> <p class="MsoBodyText"><span lang="EN-GB">This document does not apply to monitoring geohazards that are temporary, such as the stability of spoil piles, temporary cut slopes to facilitate pipeline construction, stability of excavation or trench wall, and access roads.</span></p>
StatussStandarts spēkā
ICS grupa75.020