Informējam, ka Sistēma pielāgota darbam ar interneta pārlūkprogrammu Internet Explorer (8. un jaunākām versijām) un Mozilla Firefox (3.6 un jaunākām versijām).
Izmantojot citu interneta pārlūkprogrammu, brīdinām, ka Sistēmas funkcionalitāte var tikt traucēta.
<p>The principle of the method specified is placing a cut length of pipe between two parallel flat horizontal plates, applying a constant compressive force for 1000 h (42 days), recording the deflection of the pipe at specified intervals so as to prepare a plot of pipe deflection against time, analysing the linearity of the data and calculating the creep ratio. Applies to pipes having a circular cross-section.</p>
Reģistrācijas numurs (WIID)
17874
Darbības sfēra
<p>The principle of the method specified is placing a cut length of pipe between two parallel flat horizontal plates, applying a constant compressive force for 1000 h (42 days), recording the deflection of the pipe at specified intervals so as to prepare a plot of pipe deflection against time, analysing the linearity of the data and calculating the creep ratio. Applies to pipes having a circular cross-section.</p>