Projekta Nr.ISO/ASTM TS 52949:2025
Nosaukums<p class="MsoBodyText"><span lang="EN-GB">This document addresses installation qualification (IQ), operational qualification (OQ), and performance qualification (PQ) issues directly related to the additive manufacturing system that has a direct influence on the consolidation of material. The first three elements of process validation, process mapping, risk assessment, and validation planning, are necessary pre-conditions to machine qualification, however, they are outside the scope of this document.</span></p> <p class="MsoBodyText"><span lang="EN-GB">This document covers issues directly related to the AM equipment and does not cover feedstock qualification or post processing beyond powder removal.</span></p> <p class="MsoBodyText"><span lang="EN-GB">Physical facility, personnel, process and material issues are only included to the extent necessary to support machine qualification.</span></p>
Reģistrācijas numurs (WIID)85660
Darbības sfēra<p class="MsoBodyText"><span lang="EN-GB">This document addresses installation qualification (IQ), operational qualification (OQ), and performance qualification (PQ) issues directly related to the additive manufacturing system that has a direct influence on the consolidation of material. The first three elements of process validation, process mapping, risk assessment, and validation planning, are necessary pre-conditions to machine qualification, however, they are outside the scope of this document.</span></p> <p class="MsoBodyText"><span lang="EN-GB">This document covers issues directly related to the AM equipment and does not cover feedstock qualification or post processing beyond powder removal.</span></p> <p class="MsoBodyText"><span lang="EN-GB">Physical facility, personnel, process and material issues are only included to the extent necessary to support machine qualification.</span></p>
StatussStandarts spēkā
ICS grupa25.030